Brief Description
Fourth floor rooftop composite deck with glass aluminum railing. The project required assembling of sky folds to reach a working area. Old roof was completely rotten so we was need to replace it.
At a Glance:
Project type | Deck |
Location | High Park |
Completion date | December 2016 |
Material used | Composite |
Zebra Deck, (647) 449-8800 | This email address is being protected from spambots. You need JavaScript enabled to view it. | Content Copyright © 2019 Zebra Deck, Co.