Michael

Brief Description

Fourth floor rooftop composite deck with glass aluminum railing. The project required assembling of sky folds to reach a working area.  Old roof was completely rotten so we was need to replace it.

At a Glance:

Project type Deck
Location High Park
Completion date December 2016
Material used Composite

Zebra Deck, (647) 449-8800 | This email address is being protected from spambots. You need JavaScript enabled to view it. | Content Copyright © 2019 Zebra Deck, Co.